Case study

An earned wage access portal and enrolment app for a security workforce

A member portal and an offline enrolment app, built in fixed-price phases.

Client
A workforce payroll and earned-wage-access provider for security guards, Gauteng
Sector
Workforce payroll and earned wage access
Region
Gauteng, South Africa

Stack

  • Next.js
  • Node.js
  • Progressive web app
  • Microsoft Azure
  • Azure Blob Storage
  1. Enrolment app on a phoneMember details captured in the field, offline if need be.
  2. PhotoTaken with the phone's camera in the same flow.
  3. Contract signed on the deviceThe signed contract travels with the enrolment.
  4. Approval queue in the portalSent when the phone is online; the provider's staff review and approve.
  5. Member portalAccepted members reach their information here.
How a new member is enrolled: from a phone in the field to the provider's approval queue and the member portal. Phase 2 is the enrolment app and the queue; phase 1 is the portal.

Context

The client is a workforce payroll and earned-wage-access provider for security guards, based in Gauteng. It runs payroll for the guards it serves and lets them draw on wages they have already earned. Its members do not sit at desks: they work at client sites, and most of them reach the provider through a phone.

The client is not named here. Tech Mage names a client only with written permission.

The problem

The provider needed two things, in this order.

First, members needed one place of their own to reach their information from the provider: a member portal they can open on a phone, without calling an office.

Second, signing up a new member had to happen where the guards are. That means taking down their details, a photo and a signed contract in the field, and then getting each new member checked by the provider’s staff before they are accepted. Paper forms and photos sent by chat do not give the provider a reliable record of what was captured and who approved it.

Constraints

  • Connectivity. Enrolment happens at sites, not in an office, so the app has to keep working without a connection and send what it captured once a connection returns.
  • Devices. The people doing enrolments use phones. The app has to install from a link and update itself, without an app store in between.
  • Personal information. Member details, photos and signed contracts are personal information under POPIA. Every enrolment goes through a human approval step before a member is accepted.
  • Budget and risk. The provider wanted a fixed price for each piece of work, and a working system after each piece rather than one large delivery at the end.

What we did

The work was split into fixed-price phases, with monthly hosting.

Phase 1: the member portal. A web portal for members, built with Next.js on Node.js and hosted on Microsoft Azure. It came first, and the next phase was specified after it.

Phase 2: the member enrolment app. A progressive web app (PWA) for signing up new members in the field. It has four parts:

  1. Offline capture. Details are captured on the phone and kept on the device until there is a connection to send them.
  2. Photo. The member’s photo is taken with the phone’s camera as part of the same flow.
  3. On-device contract signing. The member reads and signs the contract on the phone, so the signed document travels with the enrolment.
  4. Approval queue. Each completed enrolment lands in a queue in the portal, where the provider’s staff review and approve it.

A PWA was the deliberate choice over a native app: it installs from a link, every phone gets the same version as soon as it is released, and it is built with the same web stack as the portal.

The result

The provider has a member portal (phase 1) and a member enrolment app (phase 2) with offline capture, photo, on-device contract signing and the portal approval queue. Each phase was quoted at a fixed price.

What we learned

  • Phase the work so something usable comes early. Building the portal first gave the provider something to react to before the larger enrolment build started.
  • Design offline capture and approval together. When enrolments can arrive late and several at once, the approval queue has to show clearly what arrived, from whom and in what state.
  • Keep the specification and the code in step. When the written requirements and the built system disagree, decide which one changes, and change it on purpose.

Need something built like this?